Fabrication for Chorley Road CSO

Home / Case Studies / Fabrication for Chorley Road CSO
  • Erect a steel staircase with handrails to gain access to the roof of the CSO ensuring all necessary safety regulations are fulfilled.
  • Remove all debris from on and around the CSO including the cutting back of trees to ensure the safety barriers around the perimeter of the CSO can be secured.
  • Make safe the roof perimeter of the CSO with safety barriers and a locked gate for access at the top of the staircase.
  • Access can only be gained via a car park opposite Chorley Road and then across 3 fields as demonstrated in footage.
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.